The Swing Machine is shipped fully assembled but the various support bases require that 4-6 screws be installed. With the floor base, this usually takes about fifteen minutes.
The four basic steps are to:
1. Attach the floor mount platform to the legs
2. Position receiver on upper legs..
3. Insert the Swing Column into the top of the receiver.
4. Insert the Swing arm into the support block .
These are the four basice steps, however do not attempt to assemble the Swing Machine, mount or operate it without first reading the Operator's Manual and assembly instructions.
|
| |
Assembling the X-factor Swing Machine is very easy and only takes 10-15 minutes.
Each Professional model comes with everything you need to get set up and started on improving your golf game. Power Max Fitness makes it easy to start today and play your longest, straightest, and best golf ever.
|
|
|
|
|